Coca-Cola India · Visicooler deployment Presented by HH Global · powered by the Indigo Smart Asset Tracker Concept wireframe
Wireframe
WIREFRAME · Screen 3 · Visicooler asset dashboard · the hero screen
Visicooler asset dashboard
Coca-Cola India · Visicooler pilot · deployment VC-Q4 · 200 coolers, 50 to each of 4 metros · live as crews scan
The whole point A Visicooler is the most expensive asset Coca-Cola puts into the trade, and today it goes dark the moment it leaves the plant. This screen answers two questions in one look: 169 of the 200 reached an outlet, and the 31 that did not are split at the two checkpoints into 5 lost in transit and 26 lost at the last mile. Not a vague complaint, a specific question for a specific party.

Where the 200 coolers went, checkpoint by checkpoint

Dispatched
200
Coolers shipped
−5in transit
Level 1
195 / 200
Reached a warehouse
−26last mile
Level 2
169 / 200
Installed in an outlet
The money line Of 31 coolers Coca-Cola paid for and never saw in an outlet, the checkpoints separate the blame. 5 never reached a regional warehouse, lost in transit to Bengaluru, which is the transporter's to answer for. The other 26 reached a warehouse but were never installed, which is the crews'. Two problems, two owners, one screen.

The asset, and where the two codes live

CRATE CODE 1 Shipping crate COOLER CODE 2 Visicooler in the outlet
  • 1 Crate code · scanned at the warehouse Applied to the shipping crate before dispatch. The receiver scans it as the consignment comes off the truck, which proves the cooler reached the city it was sent to.
  • 2 Cooler code · scanned at the outlet Applied to the cooler body itself, so it stays with the asset for life. The install crew scans it on placement, and the same code is what any later audit visit reads.
Why two codes and not one The crate is thrown away; the cooler is not. One code proves delivery into the city, the other stays on a ten-year asset and can be re-scanned any time afterwards. Both resolve to the same Visicooler, so the two checkpoints join into one history.
169 / 200
Installed in an outlet (84.5%)
195 / 200
Reached a warehouse (L1)
31
Never reached an outlet
6
Placed but not cooling

By city · both checkpoints

CityDispatchedReceived (L1) Installed (L2)Never in an outlet
Mumbai50 50473
Delhi50 5039 11
Chennai50 50455
Bengaluru50 453812
Total 200195 16931
Reads at a glance Two different leaks in two different cities. Bengaluru lost 5 before the warehouse, a transport problem. Delhi received all 50 but only placed 39, the worst install rate of the four, a crew problem. Coca-Cola now knows exactly who to call.

Needs attention

!
5 short at warehouse
Bengaluru consignment, lost in transit
!
26 not installed
Reached a warehouse, never placed
6 not cooling
Placed, no power or not cold
9 damaged on arrival
Photo on file
?
2 address mismatch
GPS far from the expected outlet
Export report (PDF / CSV)

Coolers (drill down)

CoolerCityOutletInstallerCoolingWarehouse (L1)Install (L2)
VC-0142MumbaiShah Stores, Bandra WR. KambleYesReceivedInstalled
VC-0071DelhiKhan Market ProvisionsV. SinghYesReceivedInstalled
VC-0088Delhino scan··ReceivedNot installed
VC-0154ChennaiRanganathan St, T. NagarM. IyerNot coolingReceivedInstalled
VC-0196Bengalurunot received··Not received·
VC-0203Bengaluru100ft Rd, IndiranagarS. RaoYesReceivedInstalled
A cooler can miss at either checkpoint. VC-0088 reached the Delhi warehouse but was never placed, a last-mile loss. VC-0196 never reached the Bengaluru warehouse at all, a transit loss. VC-0154 is in the outlet but not cold, which is a service call rather than a missing asset. Click any row for the full record: photo, exact GPS, receiver, installer, and both scan times.

Where this goes next

Beyond deployment Because the cooler code lives on the asset and not on the packaging, the same scan works long after installation. A rep, auditor or service engineer standing in front of the cooler can re-scan it to confirm it is still in the outlet it was assigned to, still cooling, and still in condition, and each visit appends to the same history rather than overwriting it. That is the natural second phase, and it is not wireframed here: this deck covers deployment only.
Concept wireframe prepared for Coca-Cola India by HH Global · Visicooler asset dashboard · illustrative example only, figures are not real data